HG026 20x20 T-Slot V-Slot Aluminium Profile
Color:
Sliver Anodizing or Customized
OEM:
Available
Free Samples:
About 1 days can be sent
Supply Ability:
1200-1600 tons per month
Payment:
T/T, L/C
Product Origin:
Foshan China
Shipping Port:
Shenzhen/Guangzhou/Foshan
Lead Time:
7-15 Days
Product Description
Packaging Details
PE film for each profile/ Shrink PE film for each bundle, Slot packing, Craft paper/ Foam Paper/Carton box Product Detail
Material & Temper | Alloy 6063-T5,6061-T6 , We will never use aluminum scrap. |
Surface Treament | Mill-Finished, Anodizing, Powder Coating, Electrophoresis, Wood Grain, Polishing, Brushing, etc. |
Colour | Silver, Champage, Bronze, Golden, Black, Sand coating, Anodized Acid and alkali or Customized. |
Film Standard | Anodized:7-23 Ī¼ , Powder coating: 60-120 Ī¼ , Electrophoresis film: 12-25 Ī¼. |
Lifetime | Anodized for 12-15 years outdoor, Powder coating for 18-20 years outdoor. |
MOQ | 500 kgs. Usually 10-12 tons for a 20'FT; 20-23 tons for a 40HQ. |
Length | 5.8M or Customized. |
Thickness | 0.4mm-20mm or Customized. |
Application | Building and Construction and Decoration. |
Extrusion Machine | 600-3600 tons all together 6 extrusion lines. |
Capability | Output 1200 tons per month. |
Profile type |
1. Sliding window and door profiles; 2. Casement window and door profiles; 3. Aluminum profiles for LED light; 4. Tile Trim Aluminum profiles; 5. Curtain wall profile; 6. Aluminum heating insulation profiles; 7. Round/Square General profiles; 8. Aluminum heat sink; 9. Others Industry profiles. |
New Moulds | Opening new mould about 7-10 days, absolutely moulds cost can be refund. |
Free Samples | Can be available all the time, about 1 days can be sent. |
Fabrication | Die designingā Die makingā Smelting & alloyingā QCā Extrudingā Cuttingā Heat Treatmentā QCā Surface treatmentā QCā Packingā QCā Shippingā After Sale Service |
Deep Processing | CNC / Cutting / Punching / Checking / Tapping / Drilling / Milling |
Certification |
1. ISO9001-2008/ISO 9001:2008; 2. GB/T28001-2001(including all the standard of OHSAS18001:1999); 3. GB/T24001-2004/ISO 14001:2004; 4. GMC. |
Payment |
1. T/T: 30% deposite, the balance will be paid before delivery; 2. L/C: the balance irrevocable L/C at sight. |
Delivery time |
1. 15 days production ; 2. If opening mould, plus 7-10 days. |
OEM | Available. |
Table of Chemical Composition of Aluminum Alloy
Alloy | Si | Fe | Cu | Mn | Mg | Cr | Zn | Ti | Impurity | Al | |
Unit | Total | ||||||||||
6063 | 0.2-0.6 | <0.35 | <0.1 | <0.1 | 0.45-0.9 | <0.1 | <0.1 | <0.1 | <0.05 | <0.15 | Surplus |
6061 | 0.4-0.8 | 0.7 | 0.15-0.4 | <0.15 | 0.8-1.2 | 0.04-0.35 | <0.25 | <0.15 | <0.05 | <0.15 | Surplus |
6005 | 0.6-0.9 | <0.35 | <0.1 | <0.1 | 0.4-0.9 | 0.1 | <0.1 | <0.1 | <0.05 | <0.15 | Surplus |
6060 | 0.3-0.6 | 0.35-0.6 | 0.1-0.3 | <0.1 | <0.1 | <0.15 | <0.05 | <0.1 | <0.05 | <0.15 | Surplus |
Leave a Message